إرشادات مقترحات البحث معلومات خط الزمن الفهارس الخرائط الصور الوثائق الأقسام

مقاتل من الصحراء


              


(Cont.) Convention On The Prohibition Of The Development, Production,
Stockpiling And Use Of Chemical Weapons And On Their Destruction
"United Nations, 1993, pp. 1 - 172"

         (c)  Facility design drawings, process drawings, and piping and instrumentation design drawings;

         (d) Detailed technical descriptions, including design drawings and instrument specifications, for the equipment required for: removing the chemical fill from the munitions, devices, and containers; temporarily storing the drained chemical fill; destroying the chemical agent; and destroying the munitions, devices, and containers;

         (e) Detailed technical descriptions of the destruction process, including material flow rates, temperatures and pressures, and designed destruction efficiency;

         (f) Design capacity for each specific type of chemical weapon;

         (g) A detailed description of the products of destruction and the method of their ultimate disposal;

         (h) A detailed technical description of measures to facilitate inspections in accordance with this Convention;

         (i) A detailed description of any temporary holding area at the destruction facility that will be used to provide chemical weapons directly to the destruction facility, including site and facility drawings and information on the storage capacity for each specific type of chemical weapon to be destroyed at the facility;

         (j) A detailed description of the safety and medical measures in force at the facility;

         (k) A detailed description of the living quarters and working premises for the inspectors; and

         (L) Suggested measures for international verification.

32.  A State Party shall provide, for each of its chemical weapons destruction facilities, the plant operations manuals, the safety and medical plans, the laboratory operations and quality assurance and control manuals, and the environmental permits that have been obtained, except that this shall not include material previously provided.

33.  A State Party shall promptly notify the Technical Secretariat of any developments that could affect inspection activities at its destruction facilities.

34.  Deadlines for submission of the information specified in paragraphs 30 to 32 shall be considered and approved by the Conference pursuant to Article VIII, paragraph 21 (i).

<91>